Dover.uk.com
If this post contains material that is offensive, inappropriate, illegal, or is a personal attack towards yourself, please report it using the form at the end of this page.

All reported posts will be reviewed by a moderator.
  • The post you are reporting:
     
    The main work on the bridge starts today if not raining al the old wood flooring and odd parts of the bridge have now been removed it was hard work.
    The next step is to remove the rust from the steel repair the floor bearing or replace and repaint,but we do need funding so any help in that way would be good. Today we are going to try and lift the sections on to blocks so work can be done to the floor bearings this part of the job will take some weeks if the weather holds out .This is a very long bridge 3main sections and then five stair sections .Any help would be welcome my legs are shot away so help is most needed.
    But once the work has all been done and the bridge put up and in use again it will look great they do not make them this way today and it even has a roof 96%of it is rivits or nut and bolts none can be welded .Thank you.

Report Post

 
end link