Yes will do that on Friday or later tonight ,all is going along very good at this time.Just send you that email Gary please let me know if you got it.
Still finding myway round on windows 8 thank you
Guest 649- Registered: 12 Mar 2008
- Posts: 14,118
I went over on Friday wife with me had a look round the site it is nice out there this time of the year we had a bacon roll each and a cup of tea
We are all ready and keen to start work on the bridge I have taken my chair out there all we now need is the word off and the lads can start to move it around and re block up so they can get round each section and strip it out and numbered .
Guest 649- Registered: 12 Mar 2008
- Posts: 14,118
Just to give you where we are today on this one as you know my mate has wrote and we have handed that over to the EKR for the work needed to done and how to set it out and about the time it should take to have ready and up again in use for the public to walk across,
Once done it will be great to see this back in use build in about the 1902and it is coved in as well.
most of the work after t has been shot blasted will be done by their own young group they have they will be showed new trades that will help them in the years ahead with getting a new good trade jobs maybe on the main railway line its self.
Like welding.burning ,and building trades.
It will be done with others like myself who have spend many years doing this kind of work and want to pass it on to others who can get good jobs with good pay.
We are now waiting for the go ahead to start .
The EKR will have their AGM on this Saturday and hope that a costing can be worked out by them and work then can start ,Both my mate who will be the main person overseeing the work and backed up by myself and others .
All work will be done with safety rules in place setout by the EKR and all their site rules of working will be in place.They will be the main ones that over see all the work being done they have their own maintenance team of engineers there to.
So it is all looking good at this time we think the time to do all the work and put it back up over the rail will be about 3years most work will be done outside and on site weather will play a big part in the timing of getting the job done. Thank you.
Guest 649- Registered: 12 Mar 2008
- Posts: 14,118
You can go out there at this time and see the bridge and the work that we have to do.
Have a cup of tea and sandwich in their own well run café which also help the funds.
Once the work does start any viewing will have to done and worked out by EKR.
Guest 649- Registered: 12 Mar 2008
- Posts: 14,118
If you would like to join in with the work and there lots to do even if you are not a tradesman please call out there and put your name down with a email address or phone number or better still call or come and see myself anytime.Thank you.
If you have member of your family who wants to learn to weld etc again let me know.
Guest 649- Registered: 12 Mar 2008
- Posts: 14,118
I did hope to see more interest in this one that might happen once work starts on the protect