Why is it that some of the numerous signposts are not near the kerb but take up pavement space. Are the cotractors unable to put them near the kerb edge like the lamp posts.
The worst area I can think of is at the end of Frith Road at the traffic lights. The traffic light box takes up half the pavement, there is the pedestrian crossing pole, barriers and lamp post as a result the path is single file

. Pure hell especially around school arrival and departure times.