    _______________________________________________________ NOTIFICATION OF
    whoever is working on site is breaking the law, the building application below has expired so new plans will have to be drawn up, but the condition of the plans below will still have to be met.
    paragraph 4,5,6,8, 13 and 14
    so please for the wild animals birds reptiles bats etc please,please complain to the enforcement team at DDC

    GRANT OF Full Planning Permission _______________________________________________________________________
    Proposal: Residential development of site to provide a total of 97 residential units, comprising:change of use and conversion of main Westmount building to provide 19 flats, partial rebuild/repair of exiting fire damaged building and erection of four-storey rear extension, erection of 78 dwellings (comprising 26 dwellinghouses and 52 flats), together with associated substation, engineering operations, alterations to existing access, landscaping and parking (as amended)
    Location: Westmount Education Centre, Folkestone Road, Dover _________________________________________________________________________
    TAKE NOTICE that Dover District Council, the District Planning Authority under the Town and Country Planning Act, HAS GRANTED Full Planning Permission for the proposal in accordance with the application and accompanying plans received on 23/05/2008
    SUBJECT TO SUCH CONDITIONS AS ARE SPECIFIED hereunder together with the reasons for their imposition:
    1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In pursuance of Section 91 of the Town and Country Planning Act 1990 (as amended) and to enable the matter to be considered in the light of any material change in planning circumstances.
    DOV/08/00619
    2 Not more than 75% (54) of the open market residential units within the application site shall be occupied until all 25 of the affordable housing units shown on the Affordable Housing Layout drawing reference 28/50/2008 (rev C) have been constructed and made ready for occupation, the freehold interest of all the Affordable Housing Units has been transferred to a Registered Social Landlord, and the registered social landlord has entered into a deed of nomination rights with the Council. 18 of the affordable housing units shall comprise social rented accommodation, with the remainder being released on the basis of shared equity. From the date of the substantial completion of the affordable housing units they shall not be used other than for affordable housing, as defined in Annex B of PPS 3 (Dover District Local Plan Policy HS9 and the Council's SPD: ‘Delivering Affordable Housing Through the Planning System’ and South East Plan policy H3). Reason: In order to ensure meet the full range of the district's housing needs in accordance with national guidance and development plan policy. 3 The affordable housing units shown on the Affordable Housing Layout drawing reference 28/50/2008 (rev C) shall achieve Level 3 of the Code for Sustainable Homes. No such dwelling shall be occupied until a final Code Certificate has been issued for it certifying that Code Level 3 has been achieved (Dover District Local Plan Policy DD1 and South East Plan policy NRM11). Reason: In order to ensure greater energy and water efficiency through the design and layout of new development and so reduce the use of natural resources.

    4 No site clearance or other works at the site which may affect reptiles or their habitat shall be carried out until a detailed mitigation strategy has been submitted to and approved by the Local Planning Authority. All works shall then proceed in accordance with the approved strategy unless otherwise agreed in writing by the Local Planning Authority (Planning Policy Statement 9 and South East Plan Policy NRM5). Reason: In order to ensure the protection of wildlife habitats and species and so enhance biodiversity.

    5 No site clearance in connection with the development hereby permitted shall take place until a badger licence has been obtained from Natural England and a badger mitigation strategy has been submitted to and approved, in writing, by the Local Planning Authority. Any works likely to affect badgers or their setts shall proceed strictly in accordance with the approved strategy unless otherwise agreed in writing by the Local Planning Authority (Planning Policy Statement 9 and South East Plan Policy NRM5). Reason: In order to ensure the protection of wildlife habitats and species and enhance biodiversity.

    6 The development hereby permitted shall not commence until a biodiversity and landscape management plan has been submitted to and approved, in writing, by the Local Planning Authority to ensure the proper long term maintenance of the newly created chalk grassland/woodland transitional zone (Planning Policy Statement 9 and Dover District Local Plan Policy DD1 and South East Plan Policy NRM5); Reason: In order to ensure the protection of wildlife habitats and species and enhance biodiversity, and in the interests of visual amenity.
    DOV/08/00619
    7 The development hereby permitted shall not commence until a development sequence plan has been submitted to and approved, in writing, by the Local Planning Authority; upon approval, the development shall be carried out strictly in accordance with the plan, unless previously agreed in writing by the Local Planning Authority (Dover District Local Plan Policy DD1). Reason: In order to ensure that the development proceeds in a logical manner which causes minimum harm to residential amenity or other interests of acknowledged importance.

    8 No site clearance in connection with the development hereby permitted shall take place during the breeding season for birds (March - July inclusive) (Planning Policy Statement 9 and South East Plan policy NRM5). Reason: In order to ensure the protection of wildlife habitats and species and enhance biodiversity.
    9 The development hereby permitted shall not commence, nor shall any demolition take place, until a building and structural survey has been undertaken of Westmount, and this has been submitted to and approved by the Local Planning Authority. Demolition at Westmount shall be strictly limited to that set out in the approved survey (Dover District Local Plan policy DD1). Reason: To clarify and agree the extent of internal alterations and demolition and to safeguard features worthy of retention.
    10 All windows and external doors to Westmount shall be of timber construction, and all cornices, all materials and external finishes shall match those currently existing at the property unless previously agreed in writing by the Local Planning Authority (Dover District Local Plan Policy DD1). Reason: In order to ensure a high quality development.
    11 Details in the form of samples, of bricks, roof tiles and all other external materials to be used on any part of the development hereby permitted, including all approved new build works and works related to the conversion, shall be submitted and approved in writing by the Local Planning Authority before commencement of the development (Dover District Local Plan Policy DD1). Reason: In the interests of visual amenity. 12 No development shall take place until the applicant, their agents or successors in title, has secured the implementation of a programme of archaeological work in accordance with a written specification and timetable which has been submitted to and approved in writing by the Local Planning Authority.(South East Plan policy BE6). Reason: To ensure that features of archaeological interest are properly examined and recorded
    DOV/08/00619
    13 In this condition " retained tree" means an existing tree which is to be retained in accordance with the approved plans and particulars; and paragraphs (a) and (b) below shall have effect until the expiration of 5 years from the date of the occupation of the building for its permitted use.
    (a) No retained tree shall be cut down, uprooted or destroyed, nor shall any retained tree be topped or lopped other than in accordance with the approved plans and particulars, without the written approval of the Local Planning Authority. Any topping or lopping approved shall be carried out in accordance with British Standard 3998 (Tree Work);
    (b) If any retained tree is removed, uprooted or destroyed or dies, another tree shall be planted at the same place and that tree shall be of such size and species, and shall be planted at such a time, as may be specified in writing by the Local Planning Authority;
    (c) The erection of fencing or any other approved measure for the protection of any retained tree shall be undertaken in accordance with the approved plans and particulars before any equipment, machinery or materials are brought on to the site for the purposes of the development, and shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced or otherwise defined in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority.(Dover District Local Plan Policy DD1). Reason: To ensure that adequate provision is made for protection of existing trees during development works and their subsequent retention and in the interests of enhancing the quality and enjoyment of the environment.

    14 No development shall take place until full details of proposed tree, shrub and hedge planting and the proposed times of planting have been submitted to and approved in writing by the Local Planning Authority. The details shall include replacement tree planting to the west and east of the main building, and replacement habitats for breeding birds. Upon approval, all planting shall be carried out in accordance with those details and at those times. If within a period of five years from the date of the planting of any tree or shrub that tree or shrub, or any tree or shrub planted in replacement for it, is removed, uprooted or destroyed or dies (or becomes in the opinion of the Local Planning Authority, seriously damaged or defective) another tree or shrub of the same species and size as that originally planted shall be planted at the same place, unless the Local Planning Authority gives its written consent to any variation.(Dover District Local Plan Policy DD1) Reason: To ensure that adequate provision is made for the planting of trees, shrubs and hedges and in the interests of enhancing the quality and enjoyment of the environment.
    15 No development shall take place until full details of hard landscape works have been submitted to and approved in writing by the Local Planning Authority. The details shall include surface materials, all boundary treatments, details of all retaining walls (height, sections, position and materials) and full details of raised gardens. Upon approval, all works shall be carried out as approved (Dover District Local Plan Policy