Dover.uk.com
If this post contains material that is offensive, inappropriate, illegal, or is a personal attack towards yourself, please report it using the form at the end of this page.

All reported posts will be reviewed by a moderator.
  • The post you are reporting:
     
    Interested parties can still contact KCC planning department with their concerns related to the Dover Fastrack-
    Proposal DOV/20/01048 (KCC/DO/0178/2020) - Creation of two sectors of road as dedicated Bus Rapid Transit route for buses, cyclists and pedestrians only. Section 1 - New road, 1.0 km in length, connecting Whitfield Urban Expansion to Tesco roundabout at Honeywood Parkway via new overbridge over A2. Access to bridge will be controlled by bus gates. Section 2 - New road, 1.1 km in length connecting B & Q roundabout on Honeywood Park Road to Dover Road near Frith Farm, with access to Dover Road controlled by a bus gate, providing access to future phases of White Cliffs Business Park at Dover Fastrack - Land to the north of Dover and to the south of Whitfield; KCC Major Capital Projects
    Use the reference number and email KCC planning.
    The above does not reflect the changes that the proposed IBF will bring about, including the rerouting of the North Downs Way.
    At no point does this application recognise that the section of the Fastrack bus road will be used by HGVs to enter and exit the site. Make your concerns known ASAP.

Report Post

 
end link