Dover.uk.com
If this post contains material that is offensive, inappropriate, illegal, or is a personal attack towards yourself, please report it using the form at the end of this page.

All reported posts will be reviewed by a moderator.
  • The post you are reporting:
     
    just had this in from member and town councillor pat sherratt who is having trouble getting online at this time and he wants members to see the contract between the council and the contractor.


    The Contractor is required to undertake the Cleansing of the following areas and the removal of all collected material to the designated disposal facility:

    a) Areas of the River Dour to be included

    1) the pond by Buckland Mill (left hand side of the bridge)

    2) Buckland Bridge Area (by car park, right hand side of bridge)

    3) Either side of Lorne Road

    4) Whole length of Barton Path

    5) Whole length from where Park Place joins Ladywell to Castle Street

    6) and Dolphin House to Bench Street Grilles



    All areas to be treated as Zone 2b and are to be maintained to the standards of cleanliness and times for restore to a clean condition be as set out below:-

    Grade A ; No litter or refuse

    Grade B ; predominantly free of litter except for light littering of small items

    Grade C ; accumulations of litter or larger items. e.g. supermarket trolleys, car wheels etc.

    Grade D ; significant accumulations of litter, bags of refuse and any debris on the screens at entrances to culverts etc



    These areas are to be restored to Grade A standard within the following times:

    Grade B : should be restored to Grade A within 3 days

    Grade C : should be restored to Grade A next day

    Grade D ; should be restored to Grade A within hours

Report Post

 
end link