Dover.uk.com
If this post contains material that is offensive, inappropriate, illegal, or is a personal attack towards yourself, please report it using the form at the end of this page.

All reported posts will be reviewed by a moderator.
  • The post you are reporting:
     
    Ray,


    The application is specific to the bridge replacement only all the other works are simply part of the plan that shows the bridge location. That is why I'm asking Roger when we will see all the other applications.


    Any comments on all the other works on the plan in your link will be ignored. So they can cut down the trees without consultation.


    Try doing that in your own garden if you had a mature willow and see how quickly the DDC would be to take you to Court


    Jan,


    Yes the ramp is most welcome. However, imagine a cycle roaring past you at 30 miles per hour, and these state of art cycles can do this easily. Skateboarders, will have a field day. However, the path is is widened by about 2 metres into the river. Its a flood plain here so making the river narrower by 2metres is barmy. Remember Reg stopped the Hospital being built here because of the flooding problems. I don't think the people already suffering from flooding will be happy.

    Thus we have a path, NARROW AT THE EXPENSE OF A NECESSARY RIVER/and beautiful mature Willows and other trees/ with mobility scooters/push chairs/ loose children and cycles..woopee for the personal injury claims for the Council.

Report Post

 
end link