Not a great deal of time this week but I have managed to get the following done:
Weathered the last of the internal detail in the wheel wells.
Attach the wings and bomb racks - including initial seam treatment
Primed the aircraft and bombs
Airbrushed some details on wheels/props etc
here is a shot of the main structure hanging up for the primer to dry
Here are the attached bomb racks
And - here are some of the details set to dry. These have to be left for 24 hours at least to cure before being mask up to spray the next colour.
The primer shows up a lot of flaws in the seams that I have filled and will sand before applying another primer coat. This may have to be repeated until all the flaws are gone. I can also mask up and get on with finishing the props, wheels and bombs. Hopefully I will have pre-shaded the panel lines on the main structure by next week and even, perhaps have applied a base coat or two. Depends on how much time I get....