Dover.uk.com
If this post contains material that is offensive, inappropriate, illegal, or is a personal attack towards yourself, please report it using the form at the end of this page.

All reported posts will be reviewed by a moderator.
  • The post you are reporting:
     
    I know that we could do with Rivets which I have done in the pass but not fit now to do it they have bolts etc coming next week till then I do not know what we will need but your services along side our own will be a very good imput Mr Moffatt but will let you know at some point what is needed but first lets talk to Mr Gary on Tuesday the job will need funding a lot to talk about first even before it all takes off we will get back to you..THANK YOU.
    What will be needed is burning gear still a lot old rivets to burnout again we already have the skills to do that and keeping the holes good but It is the burning gear they have not got yet there is a locked place to keep them overnight at one time the whole bridge was rivets apart from the holding down bolts lots of welding to be done .It is a big job and will not done over night but as you know it is my kind of work love doing it but I am not fit to carry out a lot that's needs to be done but there is lots of help about so I look forward to taking this one on along side mates I have worked with over the years. Lets hope it all takes off in the way I hope it does, Also there is a very old bus that needs a lot done to it. But I am keeping away from that one. Nice to see so much help coming forward .

Report Post

 
end link