Dover.uk.com
If this post contains material that is offensive, inappropriate, illegal, or is a personal attack towards yourself, please report it using the form at the end of this page.

All reported posts will be reviewed by a moderator.
  • The post you are reporting:
     
    What about the road surface along townwall st and all the way from lime kiln roundabout this had a lot of money spent on it and now the surface is breaking up this was not done to good standards and not checked after it was completed. and we cant blame the snow, this was not of a proper thickness were they trying to save money, as this will now cost a lot more.

Report Post

 
end link