    The drains have been filled on a temporary basis as following opening them up, clearing them etc. it was discovered that the drains on that stretch had all either collapsed or been breached and will need replacing entirely. The KCC Highways staff believed that this most likely happened when the new gas main and associated service pipes were installed. They also pumped out the drains on the opposite side of the street as these were all some 50% plus full of silt and rubbish.

    My understanding is that they have applied for the necessary permissions to install new culverts on the shops side of the road that will connect to the main sewer, this will necessitate some significant roadworks on that part of London Road and it is likely to start in 20 - 30 days.