Dover.uk.com
If this post contains material that is offensive, inappropriate, illegal, or is a personal attack towards yourself, please report it using the form at the end of this page.

All reported posts will be reviewed by a moderator.
  • The post you are reporting:
     
    We were doing one in Canterbury and we left the steel out so we could put in the concrete flooring,,we had I know it all site boss,he came along "Why have you not put the steel in round the roof,We told him the floor had to go in first."No we will get that in put all your steels in" So have done that which was our last job that day,we went back to the work shop ,but we had a phone call from the site boss,shouting he could not get the floor in."Well we told you that would happen"Well come back and take them out."Not that easy now all building have had the nuts done up.Any way our boss came out and he told the site boss "if we do that you are going to have to pay etc,So that is what happen,we was all on over-time till about 23.00hrs.

Report Post

 
end link